Exploring the Impact of Schedule Delays, Labor Strikes and Cost Overruns on Construction Projects (2021)
Cost overruns and schedule delays have a significant impact on construction projects. This dissertation aims to uncover the relationship between cost overruns and schedule delays and assess their effects on construction projects. To understand this impact, the researcher discusses different authors’ viewpoints on the topic, the effects of cost overruns and schedule delays, and various measures to address these problems. Both quantitative and qualitative data are collected to gather information about projects and identify solutions. The SPSS tool is utilized to explain the correlation between cost overruns and schedule delays. By selecting a sample of 20 contractors, the study gains a deeper understanding of how schedule delays and cost overruns are interconnected.
The dissertation study proposes different methods to reduce the impact of cost overruns and schedule delays. It also suggests techniques to manage activities and create effective plans to enhance labor performance. The research deploys reliability tests to determine if the findings can be trusted for use by researchers, scholars, and constructors. The study’s findings reveal several factors contributing to schedule delays, including external agency interference, labor strikes, limited resources, poor management, planning errors, and inadequate site management. The research highlights that various factors influence construction projects, varying from country to country and from one project to another.
- 10,000 words – 56 pages
- Excellent use of literature
- Good analysis of subject area
- Well written throughout
- Ideal for construction management students
1 – Introduction
Background of the study
Dissertation Rationale
Dissertation Aims and Objectives
Aim
Objectives
Hypotheses
Research Scope
Significance of Study
Dissertation Structure
2 – Literature Review
Introduction
Labor Strikes
Planning Errors
Intervention by Outside Agencies
3 – Research Methodology
Research Type
Research Approach
Research Philosophy
Sampling
Data Collection
Research Limitation
Ethical Consideration
Reliability and Validity
4 – Data Analysis
Data Interpretation
Discussion of Hypotheses Findings
5 – Conclusion and Recommendations
Conclusion
Recommendations
References
Appendix
Questionnaire
